Customized suspended baskets for wind power plants: Manager Xue:156-6444-8555
Conventional external wall construction hanging basket: Manager Zhao:186-6082-0790
Address:Zhuyang Town Industrial Park, Daiyue district, Tai'an City
Many construction projects in order to catch time limit for a project, also need to continue to work in the evening, at night, use of construction equipment, especially high homework to be especially careful when using electric basket:
1, the top of the building or structure supporting hanging mechanism of bearing strength is not less than 1500 kilograms per square meter. Such as electric basket hanging mechanism by the top of the embedded parts, under embedded parts safety factor shall not be less than 3.
2, provide electric basket operation in power must be 380 v, three-phase five wire grounding power supply. From the high tension line 10 m within the scope of electric basket is strictly prohibited. Electric basket into operating range shall remove all outstanding or obstacles, fixed protrusion or corner should be set clear warning signs, do not open to open the window during the construction.
3, night construction, the construction site should have sufficient lighting, should do well in homework personnel, safety devices, electrical box, and steel wire rope, rope life moistureproof, waterproof and anti-corrosion protection measures, etc.
Copyright: Taian Juneng Construction Machinery Co., Ltd WEB: www. sdjndl.cn
Sales Department:156-6444-8555 186-6082-0790 address: Zhu Yang Zhen Wu Jia Zhuang Cun Nan, Daiyue district, Tai'an City, Shandong Province